Projects

Resilient manufacturing lines based on smart handling systems

Start: 01/01/2023 | End: 31/12/2025
  • Acronym: SMARTHANDLE
  • Leader: Tecnalia
  • Ambit: International

Handling with AI-enhanced Robotic Technologies for flexible manufactUring

Start: 01/01/2023 | End: 31/12/2025
  • Acronym: HARTU
  • Leader: Fundación Tekniker
  • Ambit: International

Digital assets and tools for circular value chains and manufacturing products

Start: 01/01/2023 | End: 30/06/2026
  • Acronym: DACAPO
  • Leader:
  • Ambit: International

Open data and industry driven environment for multiphase and multiscale materials characterization and modelling combining

Start: 01/12/2022 | End: 31/05/2026
  • Acronym: MatCHMaker
  • Leader:
  • Ambit: International

Improving energy efficiency and sustainability of wastewater treatment plants through sludge valorization

Start: 01/12/2022 | End: 30/09/2025
  • Acronym: ENEDAR
  • Leader: FACSA
  • Ambit: National

Investigation on control and electrical actuation systems by developing health monitoring technologies for sustainable aviation

Start: 01/10/2022 | End: 30/09/2025
  • Acronym: I-SISTEHMA
  • Leader: CESA - Compañía Española de Sistemas Aeronáuticos
  • Ambit: National

Research of new key enable technologies 4.0 focused on sustainable production in sawmill lines

Start: 01/10/2022 | End: 30/09/2025
  • Acronym: PACKTABLA
  • Leader: Financiera Maderera S.A. (FINSA)
  • Ambit: National

Social industrial collaborative environments integrating AI, Big Data, and Robotics for smart manufacturing

Start: 01/09/2022 | End: 31/08/2026
  • Acronym: CONVERGING
  • Leader: LABORATORY FOR MANUFACTURING SYSTEMS AND AUTOMATION (LMS) – UNIVERSITY OF PATRAS
  • Ambit: International

AI platform for integrated sustainable and circular manufacturing

Start: 01/07/2022 | End: 30/06/2025
  • Acronym: Circular TwAIn
  • Leader: Engineering Ingegneria Informatica S.p.A.
  • Ambit: International

Zero-enabling smart networked control framework for agile cyber physical production system of systems

Start: 01/06/2022 | End: 30/11/2024
  • Acronym: ZeroSWARM
  • Leader: Centre for Research and Technology-Hellas (CERTH)
  • Ambit: International

  • ...
  • 2
  • 3
  • 4
  • ...